A pair of non-LNG GEVOs bring a long and heavy Hialeah to Jacksonville mixed freight north. With 90 loads of aggregate and cement ahead of empty intermodal, empty autoracks, half an empty ethanol... (more)
FEC 226 with the set that premiered LNG fuel onto the railway.
FEC Train 210 heads Northbound towards Jacksonville, FL. As they get ready to cross the San Sebastian River in St. Augustine, FL.
FEC 226 in St. Augustine on a cool breezy morning at high tide, Seeing two GEVO's without LNG is now the exception instead of the norm.
It was a beautiful day in Colfax as 101 heads for Miami.
FEC 101 ran with four motors...two dead in tow.
A beautiful day in downtown Miami sees the Florida East Coast Railroad "Port Job" resting in the Port of Miami Terminal Yard before getting clearance off Dodge Island.
FEC is no April Fools joke...the progressive carrier continues to implement LNG power.
FEC 900 ran yet again. I like this train you never know what power will be or what will be in the consist. 900 runs when there is extra stuff in New Smyrna to come north.
FEC 800 leads 3000 without a tender on 101. Today was announced that Grupo Mexico would be buying the FEC.
FEC 101 ducks into Bunnell with an LNG set.
FEC 800 leads LNG fuel tender 300, and GE 3000 south across the Crane Creek bridge in downtown Melbourne.
FEC 810 on 210.
FEC 226 swings through St. Augustine.
FEC 101 was rather long today