In blistering 110 degree weather, Copper Basin Railway GP40-2 304 strains its way up the grade out of the enormous ASARCO Ray Copper Mine with loaded copper ore for the smelter at Hayden. Thi... (more)
Copper Basin Railway’s loaded ore train OT-1 pops out of Tunnel 2 at Ray Junction, Arizona, on April 21, 2017.
New Years Day along the Copper Basin RR found a busy railroad with train crews and MOW all working! GP39 504 in the company's new paint scheme is found outside the shops.