The first section of a UP grain train heads through the second section of street running, on it's way to the end of the line at the CHS Myrtle Grove Grain Terminal.
Train HYGB crosses over Harvey Canal Number One, which connects the Mississippi River to the Intracoastal Waterway and is lined with barge shipping & maintenance facilities.