The last non-air-conditioned commuter train pulled into the new downtown station
Anshan Iron and Steel Company's own locomotive EL1-17 pulled the freight train through the city.
Anshan Iron and Steel Company's own locomotive EL1-25 pulled the freight train through the city.
The “Changbaishan” EMU drove out of the EMU for the last time and went to Sujiatun for scrapping.
The high-speed comprehensive inspection train CRH380BJ-A-0504 headed for Shenyang North Railway Station
The high-speed comprehensive inspection train CRH380BJ-A-0504 passed through the city
The high-speed comprehensive inspection train CRH380BJ-A-0504 passed through the railway bridge.
Black clouds crush the city
0DJ55 headed for Shenyang North Railway Station
Walk through the city
The intersection of EMU and fast train
High-speed comprehensive inspection train CRH380BJ0301 crossesd the Dacheng Bridge
Train DJ455 will arrive at Shenyang Station
The train laden with ore stops at Donggang Station
The EMU train passed the bridge.