Climbing out of Albert Lea the Wells Day Job is heading east to Austin, MN with cars out of Winnebago, MN. The CP Geometry Train ran out the Jackson Sub a couple weeks ago putting a 25 mph slow order on the entire subdivision. With the track speed at 25 mph instead of 40 mph, chasing trains is a lot easier now for the time being.