Z391's power has gone to Greenwich to rescue the dead train that came up from Carey. This created the five engine lash-up, with the first three doing all the work, and the rear two units shut down, dead in tow. The 301 was still in working order, but was not needed. The EMD painted six axle will be headed back to Brewster to be repaired.