With the hills of the moraine now largely behind them, CP 3114, 1271, SLH 8245, CP 8207 and 3043 enter a broad valley at Tapley, Ontario, for the final stretch to Peterborough. CP 1271, along with the first three cars of the train, will be set out in Peterborough; the 1271 is the power for the Peterborough switcher, while the three cars are destined for local industries. 1239 hrs.