Taken with permission. The "New Yard" at Rice's Point has some of the oldest switches. The New Yard consists of tracks 9-16; 9, 10, & 11 have switches on the other end, all tracks are stubs. The 3pm Stinson is shoving a cut of cement hoppers to Holcim.