Duelling yard jobs: The crew on the left are switching out their consist before heading to Bunge, while the crew on the right switch out 421' set out and build 331's lift. Now, 1359 is paired with 1755, 1808 is by itself, and 4200 is gone, scrapped at the shop in October.