It's 0:37 AM. No more passenger trains until 4:30, but this is the time for freight traffic to begin. The usually process for freights is to pass the stations, but of course sometimes they need to stop. Like the mixed 83410 (oil/iron ore/coal) to Dunaújváros. Local railroaders say the number of stopping freights are decreasing in the past few months..
Coal and steel don't go bad. This album features long, slow, heavy freight trains; drag freights, slop freights, dead freights, etc. Trains with lots of power, and lots of different cargo slogging along behind.