Daily activities in the Bumiayu Station. CC20145 still yards in operations after pulls loaded-tank wagons trainset with CC20154 because the track from Purwokerto to Bumiayu, passes the mountain path is uphill so this trainset must be drawn two locomotive. Then, CC20154 ready to leads loaded-tank wagons alone to Tegal Station, because the condition that the track is quite flat. And the railfans still busy to shots the activities in the vicinity of the Bumiayu station, including me. I like it.