A duo of GE AC units and a single EMD SD70ACe lead 74 loads of ballast through Spanish Fork Canyon at the twin Thistle Tunnels. This nicely matched set of Herzog hoppers will be tied down on the Green River Subdivision on the passing siding at Sagers, Utah.