A Utah Railway IPP coal train loads at the Andelex Resources Wildcat loadout a few miles west of Spring Glen, Utah. Inbound coal is trucked to the loading site, batched along the ground, sorted, and conveyed into the Wildcat tipple. It takes about 2 hours to load each 91 car train at the facility in Carbon County.