521 is still working cuts in the yard as trains stack up on the Main Line. Along with the derailment blocking the East Lead, 399 is stuck on Main One with air problems. 149 waits on Main Two, Fule Dock Two, for access to the yard. Empty coal drag 711 sits on Fule Dock Three, the Battle Creek Extension and there's an inbound 395. Meanwhile work is underway to repair the damaged track and open up the East Lead.