#7935 climbing the bridge General Urquiza, One of the two bridges of the complex Zarate Brazo Largo. At the top of the bridge you can see a train stopped in the middle of it and the other in full ascent. Resistance tests were made days since a truck crashed back against the guy wires and caught fire, causing breakage of the same (note the wires Tenson the black tip), we can also see how the suspension bridge gives way under the weight of train.