Until 2005, the line was not electrified. The platform has been redone to circulate among other TGV to reduce travel time between Paris and Geneva. TGV trains currently use another route. The line will be commissioned in December. However, this is not a platform for high speed. Other regional trains will also operate there.
In the photo, this is a TGV (Iris 320) who made measurements in early September.