The 'combined' VIA train, to Jonquière and Senneterre, from Montreal, is heading to its next stop, Shawinigan, with 3 Locos (leased), 2 baggage cars and 2 coaches. One will say that this train is 'overpowered'. The reason is that the train to Jonquière has been requiring 2 locos for at least 8 months, since the turntable in Jonquière, to turn the locos, is not 'operational', and it seems that CN does not want to repair it.