On a hot, humid July morning the 7AM Tilden has just arrived at Eagle Mills with 60 loads. Power is 1801, 1852, 1804 and they are using the lead into the abandoned Pioneer Pellet Plant to double over their train onto another cut of 60 loads, building a 120 car train that the Hill Job will soon forward to the ore dock in Marquette.