Following Winter Storm "Nemo", operations on the New England Central Railroad were shut down through Saturday afternoon, when a 'Driftbuster' light engine move was dispatched out of St. Albans, Vermont to Brattleboro. NECR SD40M-2 2681 and 2714 heavy into the drift-busting at Braintree, Vermont on the Roxbury Subdivision.