Green Bay and Western RS3u No. 308 switches in Green Bay, Wisconsin, on October 14, 1985. Things were different back then with four and five man crews; one guy on the pilot of 308, and these two on the rear, and the engineer running the locomotive, and the conductor in the caboose. GB&W classified its rebuilt RS3s as 2,000 h.p. RS20s.