Lander, MD 2/25/2013 - It's 25 degrees under a full moon shortly before midnight, and the B&O CPLs at High Rock are not long for this world. With their replacements being assembled about a mile to the west, these signals would fall by the spring of 2013. They stood for decades as intermediate signals between the interlockings at East Brunswick and Point of Rocks on the CSX Metropolitan Subdivision. ISO 100, f/8, 274 seconds.