Shunting diesel locomotives TGM4 makes shunting operations at the rail tracks of Lyaskelya quarry rubble. "TGM4" is a four-axle locomotive with hydromechanical transmission, designed at Lyudinovsky Locomotive Plant. There were built 2659 sections on the whole. The first prototype of TGM4 was made in 1973