A southbound BNSF Z, Stacks and UPS trailers, charges uphill towards Tunnel 2 after being delayed by a manifest with a engine that died at the tunnel. The engineer, after several tries, able to reboot the computer and restart the engine. A lot of good natured comments from the other trains being delayed was good radio entertainment.