After getting permission to pass through Mr. M.R. Woody work limits at restriction speed over the north-end of the siding switch at Graysville, GA (MP WA-121.1 NE Graysville), CSX Q211-21 (Louisville,KY-Dixiana,SC) proceed south on the main track on the CSX Western & Atlantic Sub with a pair of older motors at the helm. Meanwhile the northbound CSX Q675-21 (Hamlet,NC-Nashville,TN) not in the photo is waiting for the southbound to clear the north-end of the holdout, before the manifest get a signal, and permission to proceed through M.R. Woody work limits.