After pulling up to the crossover at CP 1844 and a quick crew change, BNSF 6019 west departs and prepares to go through the Cameron connection and turn west towards Burlington, IA as it goes to get another load of coal from the Powder River Basin. This train originated on the CN at DTE's Monroe Power Plant in Monroe, MI and is destined for North Antelope Mine near Wright, WY.