An eastbound Canadian National stack train is about to cross over from main 1 to 2 at Geikie, Alberta, on August 5, 2016. The lead motor is pretty whipped paint-wise, but is still a bit of a rare bird. GE built 23 C44-9WLs for CN (and 4 for BCR) that are equipped with a “CN-style 4-window cab.”