After an 8-hour work window to move the mainline from the old track alignment from the 1875-built Erie Railroad bridge to the newly constructed arch bridge, the first train to cross the new Portageville Bridge over the Genesee River Gorge was eastbound train 36T, at 2:20pm, on December 11, 2017. Photo by Casey Thomason. For more information about Norfolk Southern, visit www.nscorp.com