A pair of Union Pacific locomotives lead empty grain train V057 west on CSX's Water Level Route, crossing over the Erie Canal in Newark, NY. If you look closely at the bridge structures, you can see where it was modified to allow double-stack clearance, necessitating the use of both spans from what was once a four track mainline.