With a one, two punch from the rough winter season, this time from winter storm Inga dumping an heavy amount of accumulation, than the previous winter storm Hunter that come through the Music City a few days ago. CSX Q125-16 (Memphis,TN/CN-Savannah,GA) is picking up the pace as it diverge from the single main to the main 2 after getting off the CSX Nashville Terminal/S&NA North now on the starting point of the CSX Chattanooga Sub still under control by the Nashville Terminal at Oak St. (MP J-1.3 Oak St.). The southbound hot Tote train will bypass Radnor Yard, and continue south through the snowy rolling hills of Middle Tennessee til the train arrive at the crew change point at Wauhatchie on the out skirts of Chattanooga, TN later on that evening. Photos from the C. Bamberg Collection