In the meantime, there are 6 "Girunos" built and running, all for testruns to get the final approval for Switzerland, Germany, Austria and Italy in the next months. RABe 501 # 006 fresh from the factory of StadlerRail is on a test run from Sulgen to Romanshorn, pictured at Erlen. In the far distance are visible the green presignal on the left track for an Intercity from Romanshorn, on the right track the orange presignal and the red entrance signal of Sulgen, which is 2,33 kilometer (1,44 miles) from the photographers position. The SBB ordered 29 of this 202 meter long highspeed trains from StadlerRail, mainly for traffic Switzerland-Italy.