The entirety of NS 137 is back on the move again after a brief stop at the Opelika interlocking to allow a 12K ton CSX Q606 to get through first. Having cleared the sharp curve on the west side of the diamond, today’s 50 freight cars are increasing in speed as they enter onto tangent track behind a trio of six axle NS power.