CSX W289-30 (Bridgeport,AL/SQSC-Stilesboro,GA) is tied down on the Iron Horse Resource-Sequatchie Valley Switching Co.
Sequatchie Valley main track, waiting for an outbound CSX crew to get taxi out of downtown Bridgeport, and take the train back south for Wauhatchie Yard. 12 to 24 hours ago the Sequatchie Valley Switching Co. crew was just dumping gypsum product at the USGypsum plant just a mile north of town. The 70+ car train is now facing south, and is ready to head back to the Georgia Power Plant Bowen out of Stilesboro, GA to be reloaded with the bulk product, and head back to Bridgeport on a later date. The gypsum will be processed, into sheet rock materials, and other building products, where the plant will distribute to the customers nation wide via of rail or truck.