CPR, train 15 is at Machen, Georgia on the E line, a former Central of Georgia branch that ran from Machen to Covington where a connection was made with the Georgia Railroad. The CaterParrott Railnet GP40s' ease out of the shadows and step over Ga. Hwy. 83 after retuning with a storage cut of 68 empty limestone cars that'll soon be retrieved by NS G07. The E Line through the years has never seen much action, in more recent times the line is used for just car storage. The Great Walton operated the line until September of 2009. Only in the last five years has any part of the E Line seen a wheel, CPR cleared all of the trees and other debris which had began to overtake the route from Machen to Newborn which is now the end of track. May 27, 2019