On May 12, 2014, the first cut of a 60-car unit coal train of higher sulphur coal destined for the Eastman Chemical in Kingsport, Tennessee, is finished loading at Red River Coal's prep plant and loadout at Steer Branch/Dixiana, Virginia. The locomotives are moving the loaded cars forward to the other end of the spur where they will double over the loads onto the rest of train and shove back to continue the loading process.