With a pair of 70ACe's on the rear running as DPU, Haulage right NS 736 (CSX Z368-22) is now on the CSX Chattanooga Sub, and is continuing it's trek this time south (Timetable-term) for Chattanooga. The loaded Georgia Power coal bucket inbound crew ran out of time, and had to swap crews on the NS Memphis East-End, now the relief crew is starting their shift with SC-Dispatcher lining the long coal bucket to Bridgeport, AL, where the train will have to wait for an hour, and a half til the drawbridge get a towboat, and barge through, then lock the bridge back down for rail traffic.