Alstom built highspeed tilting train RABe 503 # 012 "Ticino", coupled with ETR 610 # 010 of the SBB, is leaving the 57 kilometer long Gotthard Base Tunnel at Rynächt near Erstfeld at 160 km/h, running as Eurocity 320 from Chiasso (covid-19-timetable) via Lugano-Bellinzona-Arth Goldau-Rotkreuz to Zürich. The EC trains between Switzerland and Italy will circulate from the 29th june only, after the covid-19 shutdown. The crossborder regional trains of TILO are circulating since 15th june.