Taking the east leg of the Devon wye at CP-500 in Milford, Metro-North GP35R 102 tows Michels Corporation trench digging equipment with two GMTX GP38-2s on the rear, back towards New Haven yard where the equipment will be returned to their proper owners. The cable laying project on Metro-North’s Waterbury Branch has been completed. Since early April, the branch has been shut down for ongoing trackwork, the installation of signals, and PTC (Positive Train Control).