On January 27, 1996, Wisconsin Central train 43 has tops Byron Hill, south of Fond du Lac, Wisconsin, in extremely high winds and well below zero temperatures. The area around Fond du Lac received over two feet of snow over the previous three days before a frigid Arctic high settled in over the region, making standing on this overpass waiting for the train almost unbearable.