The crew from Transdev Rail, installing new rail and concrete ties on Metrolink’s Orange Sub, have paused their work as Metrolink train 600, behind F125 933, heading to Oceanside from Los Angeles, approaches the Tustin station. The new track, at this point, appears to look more like track found on an amusement park roller coaster, but within another day or two it will be straight and level. (Tustin, California – March 17, 2021)