BNSF Railway train B-LPKSCO5-03A, a 7,559-foot train consisting of 86 empty intermodal cars, winds its way through Santa Ana Canyon as it heads to Long Beach CA from Kansas City KS. The train is 12 hours 45 minutes behind schedule as it passes through Esperanza, but engineer Radulski and conductor Medawar, in the cab of Dash 9-44CW 5037 (teamed with ES44C4 6917) should have a clear run to the harbor area this afternoon. (Yorba Linda, California – February 5, 2022)