LTA41 takes the siding at Donehower on a beautiful Sunday evening, with a sharp looking SD62E overhaul in the lead. Upon reaching Tower CK in Winona, the train will shove into the UP yard, and the crew will cab back to Adams. The 1142 will be used during the week by the Winona switch job, while the 2198 will sit around for five days until it is time to make the trip back to Adams on Friday.