Having worked for the past two hours shunting hoppers at the Cargill plant, 45R waits for a final conductor's inspection before taking their empties back up to Illinois for loading.
A trio of GE monotone units provides power, with the leader being a relatively new unit, rebuilt from D9-44CW 9178 in June of 2021.