A second "LB" utility job was sent from Laurel to clean up Livingston Yard, which was essentially 80% auto racks. After meeting the standard LB west, this job heads east. The two 4400's were supposed to be on the LM job, which was held back for this move. Was hoping the two SD's would rejoin the LB job the following week, but it wasn't so.