The 2-6-0 "Mogul" passenger train steamlocomotive B 3/4 # 1367 stands on the pit under the former platform roof of Wildegg, in the railroad park Brugg AG. The locomotive was brought to operating temperature with a prior load run to Wettingen and Dottikon-Dintikon. Experts from the DB Dampflokwerk in Meiningen carry out a so-called standing test, during which exact data from the running gear and drive are collected in order to estimate the scope of an overhaul. The locomotive was overhauled for the last time in 1978.