The snow blower Xrotm #96 is made ready for the winter at Erstfeld station. In the process, the rotating superstructure is turned in the direction of Göschenen. The machine arrived shortly before from IW Biel. For the transfer from Biel to Erstfeld, another locomotive was in front of it, which is why the blower was standing the wrong way round.