Copper Basin Railway’s OT-1 ore shuttle train prepares to dump its train of copper ore at Asarco’s unloading facility at Hayden, Arizona, on April 20, 2017. The arriving CBRY OT-1 unloads the front half of the train and then stops, cuts the power off and runs around the unloading facility. After reversing back to their train, it then backs the entire train through the loader and then begins unloading the other half of the train.
Not
just heritage schemes, not just commemorative schemes - this album is devoted to some of the world's most interesting paint schemes, past or present.