On August 10, a northbound freight train derailed in the 57-kilometer-long Gotthard Base Tunnel, and since then both tubes have been closed. All passenger traffic, as well as freight traffic that can pass through the smaller profile, travels via the Gotthard mountain route, today also called the panorama route. Re 420 # 288 and Re 620 # 067 "Bodio" of the SBB in multiple control pull the train 60501 from Basel freight yard to Biasca over the 42 meter long Intschialpbach bridge between Amsteg-Silenen and Gurtnellen. The load was the "VANOLI" railway crane XII "KRC1100" with material cars for work in the Base Tunnel (bring out about 20 derailed cars).