We did a great afternoon chase with the Salina to Limon local freight train. The sun came out at the right time, as they headed out of Burlington. As anytime with the Kyle, these jobs do things as hard as possible. With 2 hour of work at Burlington, and 90" work at Stratton, and a 9 hour base schedule for the crew, the train went 30 miles. A severe storms passed behind us as they do work at Stratton.