We did a great afternoon chase with the Salina to Limon local freight train. The sun came out at the right time, as they got to Burlington. As anytime with the Kyle, these jobs do things as hard as possible. With 2 hour of work at here, and 90" work at Stratton, and a 9 hour base schedule for the crew, the train went 30 miles. Crew spent time switching out loaded grain cars behind a bunch here.