Today's Westbound consists of two SD40-2s and a loaded welded rail train. The rail would be dumped West of Philip the next day. Currently, a lot of the trackage between Pierre and Rapid City is limited to 10 MPH. Even in locations where welded rail has already been installed along the PRC, the RCPE is constantly battling roadbed issues due to the ground being extremely soft.